FREE TOOLS · NO ACCOUNT REQUIRED
Find the right tool
for the job.
Choose what you need to work on. Try the example, then use your own numbers.
How these tools fit Operational Excellence
Every tool at a glance
Eight guided studios and five classic workspaces, free to use — plus two premium intelligence products.
- OEE & loss explorerGuided studio
- Pareto Priority LabGuided studio
- Value calculatorGuided studio
- 5 Whys worksheetGuided studio
- FishboneGuided studio
- Process-mapping toolGuided studio
- 6S self-checkGuided studio
- Handover builderGuided studio
- Time Study Lab
- Staffing calculator
- Mistake-proofing checklist
- A3 improvement story
- DMAIC investigation
- Safety IntelligencePremium
- Waste OpportunityPremium
Premium tools
Free trial available8 Wastes / Muda
Waste Opportunity
Find waste. Measure the opportunity. Fix the cause. Verify the value.
Start observation3 successful Waste Opportunities included free
Then continue with Plus — $9.99 USD/month.
How the free trial works
- Verified Free accounts include 3 successful Waste Opportunity completions over the lifetime of the account.
- Drafts, edits and previews do not consume a use.
- Safety has its own separate 3-case allowance.
- Continued premium use follows your current Plus or Teams access.
ObserveMeasureActVerify
START WITH THE PROBLEM
What are you trying to improve?
Choose the work in front of you. Get a practical starting point.
Missing production targetNot enough peopleRepeated quality issueToo much downtimeUnderstand the biggest loss
You know the work.
Let’s find a useful starting point.
START HERE · Not enough people
Staffing calculator
Why this tool
Compare workload with productive time and the people available.
What you’ll learn
An arithmetic starting point for the staffing discussion. Check skills and process limits.
OPTIONAL NEXT STEP
Time Study Lab
START HERE · Missing production target
OEE & loss explorer
Why this tool
Separate downtime, speed and quality loss in equipment output.
What you’ll learn
Which loss component needs attention before setting a recovery plan.
OPTIONAL NEXT STEP
Pareto Priority Lab
START HERE · Too much downtime
Pareto Priority Lab
Why this tool
Rank recorded downtime categories using minutes on the same basis.
What you’ll learn
Where the lost time concentrates; the largest category is not yet a root cause.
OPTIONAL NEXT STEP
Fishbone
START HERE · Repeated quality issue
Pareto Priority Lab
Why this tool
Find whether one defect category drives most of the recorded problem.
What you’ll learn
A clear focus for evidence collection. Then organize possible causes with Fishbone and test a path with 5 Whys.
START HERE · Long cycle time
Time Study Lab
Why this tool
Observe comparable cycles and compare them with the pace demand requires.
What you’ll learn
The distribution of observed times, with the work boundary and units made clear.
OPTIONAL NEXT STEP
Staffing calculator
START HERE · Too much changeover time
Time Study Lab
Why this tool
Time defined changeover steps before changing the sequence.
What you’ll learn
Where setup time goes. Review internal and external work safely with the people doing it.
OPTIONAL NEXT STEPSMED guide →
START HERE · Too many problems at once
Pareto Priority Lab
Why this tool
Put comparable problems on one measure: count, time or cost.
What you’ll learn
Which category deserves the first investigation.
OPTIONAL NEXT STEP
A3 improvement story
START HERE · Understand the biggest loss
Pareto Priority Lab
Why this tool
Rank observed loss categories and review their cumulative contribution.
What you’ll learn
What to investigate first, using the measure that fits the decision.
OPTIONAL NEXT STEP
OEE & loss explorer
START HERE · Find a root cause
Fishbone
Why this tool
Organize possible explanations and choose evidence checks.
What you’ll learn
Which hypotheses need testing; a diagram alone does not verify a cause.
OPTIONAL NEXT STEP
5 Whys worksheet
START HERE · Justify an improvement
Value calculator
Why this tool
Compare time released with the assumptions behind its estimated value.
What you’ll learn
The difference between additional capacity and cash savings.
OPTIONAL NEXT STEP
A3 improvement story
START HERE · Organize an improvement project
A3 improvement story
Why this tool
Connect the gap, evidence, target and next trial in a single story.
What you’ll learn
What the team knows, what remains uncertain and what to review next.
OPTIONAL NEXT STEP
DMAIC investigation
START HERE · Prepare a better shift handover
Handover builder
Why this tool
Record current status, unresolved issues and next actions.
What you’ll learn
What the incoming shift needs to check and who owns the next step.
OPTIONAL NEXT STEPHandover guide →
START HERE · Map the process
Process-mapping tool
Why this tool
Lay out actual steps, decisions, handoffs and waits.
What you’ll learn
Where the work loops or waits, within a clearly defined boundary.
OPTIONAL NEXT STEPFlow guide →
START HERE · Improve workplace organization
6S self-check
Why this tool
Review workplace conditions and record practical follow-up.
What you’ll learn
Which observations need an owner and review; this is not a safety certification.
OPTIONAL NEXT STEP
Mistake-proofing checklist
A practical guide, not an AI chat.
01Plan work
Check time, workload and capacity before making the plan.
Time Study Lab
Time the work and compare it with the pace demand requires.
EXAMPLE
Demand sets the pace
30sTakt / unit
420Available min
÷840Units required
Staffing calculator
Estimate how many people you need for the planned workload.
EXAMPLE
Workload coverage
4people
1,500labor min
384min / person
Value calculator
Estimate time released and keep it separate from cash savings.
EXAMPLE
3.33 hours · $100 time value
02Understand losses
Choose a focus. Then investigate what is happening and why.
Fishbone
Map possible causes before deciding what evidence to collect.
EXAMPLE
MethodMaterialMachinePossible causes → Evidence check
OEE & loss explorer
See how downtime, speed and quality affect equipment output.
EXAMPLE
Equipment effectiveness
80%OEE
90%Availability
92.59%Performance
96%Quality
Pareto Priority Lab
See which categories account for most of your losses.
EXAMPLE
Loss priorities
100Recorded min
SetupMaterialStops
Cumulative80% reference
5 Whys worksheet
Work through a repeat problem and check each explanation.
EXAMPLE
Wrong leaflet packed
Possible cause: mixed leaflets at staging.
Evidence check: review staging and changeover records.
03Follow through
Make the next step clear and the work easier to repeat.
Mistake-proofing checklist
Plan ways to prevent an error or catch it at the source.
EXAMPLEPrevent · Detect · Contain
6S self-check
Review workplace order, cleanliness, standards and safety.
EXAMPLE15 / 24 · improvement priorities
Process-mapping tool
Lay out the steps, handoffs and waits in a process.
EXAMPLE
- Receive
- Check
- Pack
Handover builder
Leave the next shift a clear record of open work and actions.
EXAMPLE
Open issueOwnerReview dateA clear next step for the shift
04Connected work
Keep the evidence, actions and follow-up together.
A3 improvement story
Keep the problem, evidence, trial and follow-up in one story.
EXAMPLE
GapEvidenceTrialOne improvement story
DMAIC investigation
Organize a longer investigation from the problem to the control plan.
EXAMPLE
- Define
- Measure
- Analyze
- Improve
- Control
Saved work
Open a saved project and continue where you left off.

